Jump to Footer

Updates

12-16-2016: Loading Dock

As part of the continuing construction for the new Dining Hall the excavation for the new loading dock will begin on December 19, 2016. The location of the loading dock will be at the rear of the Campus Center and most major work for this part will be done by February 1, 2017.

During this construction time the service delivery door at the rear of the Campus Center will not be in operation. Deliveries to the building will be made through the Senate Chambers door. Just inside the corridor at this location a temporary service ramp will be installed to help navigate the two steps near this doorway.

This service ramp will cover one half of the width of these stairs and the other half will remain accessible as a stair.

The existing delivery door that will be taken out of service is not a designated emergency exit. This means that all emergency evacuation routes will remain the same.

Any student, faculty, staff or visitor that intends to use the rear entrance should be advised of this change.